Below is the complete list of documents, reports and plans that are available for downloading. To view them you might need to download and install Adobe's free Acrobat Reader.
Links to these documents will open in a new window, but please be patient as some files are quite large.
Please note that the use and content of these documents is protected by copyright.
A - Application Contents
• Application Contents.pdf (84.5 KB)
A1 - Letter Forms
• Covering Letter & Application Forms.pdf (399 KB)
A2 - Masterplan Drawings
A2 - Architects drawings
• Draft common cover sheet rev F individual.pdf (39.6 KB)
• Masterplan Architects Drawings.pdf (9.74 MB)A2 - landscape Architects drawings
• Masterplan Landscape Plans.pdf (1.41 MB)
A3 - Off-site Highways Works
• Offsite Highways Works.pdf (15.2 MB)
A4 - Mechanism for Planning Conditions and S106
• Aylesham Mechanism forPlanningOblig 07 D01.pdf (170 KB)
A5 - Aylesham Design Code
• 18082A - Design Code - Rev J .pdf (56.4 MB)
B - Full Application Drawings
• Cover sheet.pdf (39.5 kB)
B1 - Phase 1A Site plans
• Phase 1A Site Plans.pdf (5.31 MB)B2 - Tree Survey
• B2 - Tree Survey.pdf (5.04 MB)B3 - Plot Schedule
• Hillreed and Ward - Phase 1A Schedule - Rev F - 04 07 07-1.pdf (71.4 KB)B4 - Market Square Architecture
• Market Square Architecture.pdf (5.66 MB)B5 - Site Sectional Elevations
• Site Sectional Elevations.pdf (4.30 MB)B6 - House Types
Hillreed Homes
• Hillreed Homes.pdf (15.1 MB)Ward Homes
• Ward Homes.pdf (6.58 MB)B7 - Phase 1A Landscape Architecture
• Phase 1A Landscape Architecture.pdf (3.87 MB)B8 - Highways Drawings
• Highways Drawings.pdf (1.09 MB)
C1 - Planning Statement
• Planning Statement 180607.pdf (416 KB)
C2 - Design & Access Statement
• Design & Access Statement.pdf (24.5 MB)
C3 - Environmental Statement exec summary
• ES Non Technical Summary 10.08.07.pdf (557 KB)
C4 - Environmental Statement
• ES 20.07.07.pdf (61.4 MB)
• ES Appendices 20.07.07.pdf (6.53 MB)
C5 - Transport Assessment exec summary
• 1 690124_TA_Aylesham_Rep115_Summary.pdf (71.7 MB)
C6 - Transport Assessment
• 2 690124_TA_Aylesham_Rep115.pdf (364 KB)
• 3 690124_TA_Aylesham_Rep115_Appendice.pdf (41.7 MB)
C7 - Infrastructure Statement
• AyleshamInfrastructureStatm 07 D01.pdf (263 KB)
C8 - Market Square Transport Assessment exec summary
• 1 690124_Market_TA_Rep114_Summary.pdf (73.2 KB)
C9 - Market Square Transport Assessment
• 2 690124_Market_TA_Rep114.pdf (326 KB)
• 3 690124_Market_TA_TA_Rep114_Appendices.pdf (12.1 MB)
C10 - Sustainability Appraisal
• Sustainability Appraisal 20.07.07.pdf (1.45 MB)
C11 - Management Plan
• 07 09 05 management Plan 07.pdf (3.50 MB)
C12 - Aylesham Leisure Needs Study
• AyleshamLeisureNeedsStudy-FinalReport-03Aug2007.pdf
(1.44 MB)